Cold storage standard installation and commissioning strategy 1. Installation Specification of Cold Storage Enter the construction site, according to the construction drawings, verify the implementation of the work, determine the installation location of the equipment (storage body, drain door, evaporator, host, condenser, control system, etc.).
Floor installation 1. Level the floor first, then install the floor, select the beautiful floor in a conspicuous place, and make the floor and evaporator drainage system.
2. The quality requirements are that the floor is installed flat, the floor is cushioned with materials, and the hooks between the plates are locked to achieve a flat surface and no hollow feeling. (Note that if the drainage system is installed outdoors in the north, the drainage pipe needs to be insulated). Vertical board installation
1. Choose a corner according to the situation of the site, and position it (that is, the vertical board and the floor are locked). This angle extends to both sides, only the vertical board and the vertical board are locked, and the position at the vertical corner is beautiful. Put the board in a conspicuous place, and install the drain pipe in advance when it is installed on the side of the evaporator. U-bend and silicone are required outside the warehouse. 2. The quality requirement is that the conspicuous surface of the vertical board is flat, the storage board has no concave points, the upper surface of the vertical board is flush, the gap between the vertical board and the vertical board is uniform, and the vertical angle of the conspicuous part is flush with the floor angle.