Cold storage standard installation and commissioning strategy

Cold storage standard installation and commissioning strategy 1. Installation Specification of Cold Storage    Enter the construction site, according to the construction drawings, verify the implementation of the work, determine the installation location of the equipment (storage body, drain door, evaporator, host, condenser, control system, etc.).

refrigeration compressor,compressor,Mitsubishi Compressor,Bristol Compressor,HITACHI Compressor,Danfoss compressor to solve the problem

   Floor installation    1. Level the floor first, then install the floor, select the beautiful floor in a conspicuous place, and make the floor and evaporator drainage system.

refrigeration compressor,compressor,Mitsubishi Compressor,Bristol Compressor,HITACHI Compressor,Danfoss compressor to solve the problem

  2. The quality requirements are that the floor is installed flat, the floor is cushioned with materials, and the hooks between the plates are locked to achieve a flat surface and no hollow feeling. (Note that if the drainage system is installed outdoors in the north, the drainage pipe needs to be insulated).   Vertical board installation

refrigeration compressor,compressor,Mitsubishi Compressor,Bristol Compressor,HITACHI Compressor,Danfoss compressor to solve the problem

1. Choose a corner according to the situation of the site, and position it (that is, the vertical board and the floor are locked). This angle extends to both sides, only the vertical board and the vertical board are locked, and the position at the vertical corner is beautiful. Put the board in a conspicuous place, and install the drain pipe in advance when it is installed on the side of the evaporator. U-bend and silicone are required outside the warehouse.    2. The quality requirement is that the conspicuous surface of the vertical board is flat, the storage board has no concave points, the upper surface of the vertical board is flush, the gap between the vertical board and the vertical board is uniform, and the vertical angle of the conspicuous part is flush with the floor angle.

  

Recent related posts

Customers frequently viewed

New In stock for sale, IWAYA DENKI Water Pump 25CJT0752

IWAYA DENKI Water Pump 25CJT0752

US$2307.69
New In stock for sale, ROTEN Mechanical Seal 8E5K-22-X

ROTEN Mechanical Seal 8E5K-22-X

US$384.62
New In stock for sale, BPJ Bearing 53216U/P2

BPJ Bearing 53216U/P2

US$126.46
New In stock for sale, HAWKER Battery EV24-40 2.0

HAWKER Battery EV24-40 2.0

US$2500.00
New In stock for sale, TR Encoder 100-00765

TR Encoder 100-00765

US$341.55
New In stock for sale, LNTECH Light Curtain SNA2230

LNTECH Light Curtain SNA2230

US$846.15
New In stock for sale, IFM Sensor IIS230

IFM Sensor IIS230

US$103.85
New In stock for sale, AFE Relay BJS-SS-124LM

AFE Relay BJS-SS-124LM

US$0.58