How to add refrigerant to central air-conditioning, what operating methods do you know? Let’s take a look with the editor of okmarts.com today!
1, quantitative fluoride
Connect the three-way valve, pressure gauge, fluorine hose, fluorine bottle or vacuum pump to the process port of the three-way stop valve. After fluorine is discharged and vacuumed, start to add fluorine slowly. Use a platform scale and other more accurate measuring tools to weigh, When the reduction of fluorine in the fluorine bottle is the standard fluorine addition on the air conditioner nameplate, close the fluorine bottle valve.
2, measure current
Set the air conditioner in the cooling or heating high-speed wind state (the inverter air conditioner is set in the trial operation state), and observe the change of the clamp ammeter while adding fluorine at the process port of the low-pressure shut-off valve. When the value is set, the fluorine bottle valve is closed. At this time, let the air conditioner continue to operate for a period of time. When the room temperature is close to 27°C in the cooling state or the room temperature is close to 20°C in the heating state, the air temperature of the outdoor unit and the voltage of the power grid will be considered. The factor of working current, while fine-tuning the amount of fluorine added to reach the rated working current value, to achieve the correct fluorine addition. The reason for the fine-tuning is that the rated working current value calibrated on the air conditioner nameplate is tested by the air conditioner manufacturer under the following conditions Data: Cooling status, fan high-speed wind at power supply voltage 220V or 380V, indoor air temperature 27℃, outdoor unit air temperature 35℃; heating status, fan high speed wind at power supply voltage 220V or 380V, indoor air temperature 20℃, outdoor unit The air temperature is 7°C. The fine-tuning data summarized in practice is: in the cooling state, the outdoor unit air temperature is 35°C as the scale, and the outdoor temperature increases or decreases by 1°C, and the rated operating current value is increased or decreased by 1.4%; heating state When the outdoor unit air temperature is 7℃ as the scale, the outdoor temperature will increase or decrease by 1℃, increase or decrease 1% of the rated working current value; in the cooling or heating state, the rated power supply voltage is 220V or 380V as the scale, Every time the power supply voltage increases or decreases by 1V, the rated operating current value is reduced or increased.
3, pressure measurement method
Put the air conditioner in a high-speed cooling state (in winter, when heating needs to add fluoride, set the air conditioner in a forced cooling state or place the room temperature sensor in warm water at about 27°C to simulate the summer temperature to keep the air conditioner in a cooling state), At the process port of the low-pressure shut-off valve, observe the low pressure of the vacuum pressure gauge while adding fluorine. When the low pressure is 0.49MPa (in summer) or 0.25MPa (in winter), close the fluorine cylinder valve. Then consider the outdoor unit air temperature and indoor cooling load The size and other factors that affect the low pressure pressure, fine-tune the amount of freon and the gauge pressure, so as to correctly add fluorine. The reason for the fine-tuning is that the low pressure is proportional to the indoor cooling load, that is, the greater the cooling load, the higher the pressure, and vice versa. ;Because the fluorination process port and surrounding pipes are installed outdoors, their pressure and evaporation temperature are greatly affected by the outside air temperature. The actual pressure and evaporation temperature of the indoor heat exchanger should be higher in summer and lower in winter. Summary in practice When the fan has high-speed wind and the indoor temperature is 27°C, the low-pressure pressure data is shown in the attached table.
4. Observation method
Set the air conditioner to operate in the state of cooling or heating high-speed wind. When the amount of fluorine is correct, the temperature difference between the inlet and outlet of the indoor heat exchanger is 10cm: greater than 12°C during cooling, greater than 16°C during heating; indoors during cooling The heat exchanger has all condensation, the average low evaporation sound, condensation at the outdoor shut-off valve, continuous condensation and dripping in summer, and no frost or dew at the junction of the indoor heat exchanger and the capillary; when heating, the wall temperature of the indoor heat exchanger Above 40°C.
In actual maintenance, when the frequency conversion air conditioner has a high requirement for the correctness of the amount of fluorine, or the fixed frequency air conditioner needs to be vacuumed due to the refrigeration pipeline system, the quantitative fluoride method should be adopted. If the pipeline system needs to be supplemented with fluorine, it is appropriate Adopt the method of measuring current as the main, measuring gauge pressure as the supplement, and taking into account the observation.

Related Info
The phenomenon that the pressure switch of automobile air conditioner is broken How to judge the car air conditioner expansion valve ice block What are the symptoms Have you figured out the "enthalpy" and "entropy" of the refrigeration system? 8 simple maintenance common sense of combined cold storage you must understand Acceptance standards after the cold storage design and installation are completedAdding method of refrigerant in central air conditioner
Subscribe to relevant news content?
Subscription
Unsubscription
Recent related posts
Customers frequently viewed
IWAYA DENKI Water Pump 25CJT0752
US$2307.69
Panasonic Servo Motor MHMF022L1V2M
US$653.85
Honeywell Solenoid Valve VE4025B1045
US$334.62
ROTEN Mechanical Seal 8E5K-22-X
US$384.62
SCHNEEBERGER Linear Guideway BMW30C-G1V0
US$231.55
BKD Bearing 51210
US$27.00
PIZZATO Switch FR 2096-X
US$576.92
Nais Relay HC2-HPL-AC48V-F
US$44.62
CHELIC Air Cylinder TRU20*75
Contact Us
HENGSTLER Encoder RI76TD/4096ED.4A15KF
Contact Us
HONTKO Encoder HPN-6A-2-2-PP
Contact Us
ORION Fan OA938AP-11-1WB1855
US$77.50
ATOS Solenoid Valve SDHI-0639/O-X24DC
Contact Us
PENTAX Water Pump CR100/01
US$565.38