Correct operation method and precautions of distribution box during cold storage installation
In the process of cold storage installation, the use of cold storage power distribution boxes is a very important content, but most people are not very familiar with the normal operation of cold storage power distribution boxes. Today we will follow the refrigeration experts to learn about cold storage power distribution The correct operation method of the box
.
After the cold storage is installed, the wiring outside the cold storage distribution box must be protected by the correct method. For example, the wiring of steel pipe and hose, we had better place it in a place that is not easily damaged, otherwise it may cause The wiring of the cold storage power distribution box was unnecessarily damaged.
After the cold storage is installed, the power cord between the power distribution box and the machine tools is best placed in the middle of the bridge, and the bridge also needs to use the base to support it. Kuhua Refrigeration said that it is recommended that the bridge is not used Direct ground contact.
The piping outside the cold storage distribution box also needs to be unified, which is also an important content after the cold storage installation. If there is a phenomenon of inconsistency, then in the later use, there will be frequent failures and waste our unnecessary maintenance costs. I hope everyone should grasp this.
When installing the cold storage, you need to pay attention to the connection of the distribution box packaging machine or other heating equipment. When wiring, you need to stay away from the place close to the heating. The wiring is best placed in the connection box. The heater connection line is * good It is made of glass or ceramic pipe electric wires. For safety reasons, flammable electric wires are not allowed.
Outside the cold storage distribution box, all wires need to be placed in the connection box when they are connected. This is also an important part of the cold storage installation process. In addition, there must be no joints in the middle of the connection line.
The protection level of all connection boxes and wire entrances of the cold storage distribution box must be above IP55. This is a content that everyone needs to pay attention to when installing the cold storage.
It is better to use two wires to link the relay terminal block. If you need to link more than three wires, it is best to install other terminal blocks, otherwise it will also affect the normal use of the distribution box.
If the sensor is placed in a place that is easy to damage when wiring, it is best to use a hose to protect it. The use of the hose is best to be placed directly at the root of the sensor. This content is also during cold storage installation. Need attention.
At the same time, after the cold storage is installed, the normal use of the distribution box needs to be checked frequently. Once hidden dangers arise, they must be dealt with immediately, otherwise it will affect the normal use and may even cause economic losses. Hope Everyone must pay attention to inspection.
The above is the knowledge of the correct operation of the distribution box during the cold storage installation. In order to make the function of the distribution box function normally, we need to pay attention to these contents. This will play an auxiliary role for the normal use of cold storage.

Related Info
Acceptance standards after the cold storage design and installation are completed Adding method of refrigerant in central air conditioner Air-cooled modular cold and hot water unit configuration and takeover notes Cold storage refrigeration equipment cleaning sequence Compressor in the industrial chiller system produces wet stroke fault and troubleshootingCorrect operation method and precautions of distribution box during cold storage installation
Subscribe to relevant news content?
Subscription
Unsubscription
Recent related posts
Customers frequently viewed
IWAYA DENKI Water Pump 25CJT0752
US$2307.69
Panasonic Servo Motor MHMF022L1V2M
US$653.85
Honeywell Solenoid Valve VE4025B1045
US$334.62
ROTEN Mechanical Seal 8E5K-22-X
US$384.62
Schneider Servo Motor BCH2MM0613CA6C
US$1142.09
Balluff Sensor BES057R
US$131.92
Samsung Capacitor 10UF 100V
Contact Us
Copeland Compressor ZPDT12MCE-TFC-600
Contact Us
BANDO Belt DS8M-480-130
US$223.08
Copeland Compressor KAJB-007E-IAA-100
Contact Us
KEYENCE Light Curtain PJ-S24
Contact Us
Yaskawa Servo Motor SGMPH-04ABA-SF22
US$2076.92
Yuken Proportional Valve EHDFG-04-130-2E-10
US$2427.20