Factors affecting the quality of air compressors human, machine, material, method, environment, and measurement....
First of all, let's understand what is 5M1E?
A) Man: The operator’s knowledge of quality, technical proficiency, physical condition, etc.;
B) Machine (Machine): the accuracy and maintenance status of machinery equipment and measuring instruments;
C) Material (Material): the composition, physical and chemical properties of the material;
D) Method: This includes production technology, equipment selection, operating procedures, etc.;
E) Measurement (Measurement): mainly refers to whether the method adopted in measurement is standard and correct;
F) Environment (Environment): the temperature, humidity, lighting and cleaning conditions of the workplace;
Because the first letters of the English names of these five factors are M and E, they are often referred to as 5M1E.
We know that process is the basic link of product formation, process quality is the basis for guaranteeing product quality, and process quality has an important impact on product quality, production cost, and production efficiency.
Process standardization operations play a key role in ensuring process quality, and process standardization has a prominent position in process quality improvement.
The quality of the process is affected by the six factors of 5M1E, namely human, machine, material, method, environment and measurement. The standardization of the process is to seek the standardization of 5M1E.
Then how do we control these six factors to form standardization to achieve the purpose of stabilizing product quality?
1. Operator factor (person)
Person's analysis:
1) Skill problem?
2) Does the system affect people's work?
3) Is it a matter of selection?
4) Is the training insufficient?
5) Is the skill wrong?
6) Is it the people who are enthusiastic about the company?
7) Is there a responsible person?
8) Can people operate machines? Does the person adapt to the environment? Does anyone understand the method? Does anyone know the material?
Main control measures:
(1) Production personnel meet the job skill requirements and have passed relevant training and assessment.
(2) For special processes, the professional knowledge and operating skills of special process operations and inspection personnel should be clearly specified, and those who pass the assessment should be certified.
(3) The operator can strictly abide by the company's system and strictly operate in accordance with the process documents, and be responsible for the work and quality.
(4) Inspectors can conduct inspections in strict accordance with process regulations and inspection instructions, make original inspection records, and submit them as required.
2, equipment factor (machine)
machine analysis:
refers to the auxiliary production tools such as equipment and tools used in production. In production, whether the equipment is operating normally and the quality of the tools are another factor that affects the production schedule and product quality.
1) Is the selection correct?
2) Is there a maintenance problem?
3) Does it correspond to the equipment?
4) Is the person who is a machine right? Is the operation method of the machine correct? Is the environment where the machine fits?
The management of machinery and equipment is divided into three aspects, namely, use, inspection and maintenance. Use is to train operators according to the performance and operating requirements of the equipment, so that they can correctly operate the equipment for production. This is the most basic content of equipment management.
Spot inspection refers to the confirmation of the status and performance of the equipment according to certain standards before and after use, early detection of equipment abnormalities, and prevention of unintended use of the equipment. This is the key to equipment management.
Maintenance refers to the maintenance, cleaning, and oiling of the equipment at certain intervals according to the characteristics of the equipment to prevent equipment deterioration and extend the service life of the equipment. It is an important part of equipment management.
The main control measures are:
(1) There are complete equipment management methods, including clear regulations on equipment purchase, circulation, maintenance, maintenance, and verification.
(2) All provisions of the Equipment Management Measures are effectively implemented, with equipment ledger, equipment skill files, maintenance verification plan, relevant records, complete and accurate.
(3) Production equipment, inspection equipment, tooling tools, measuring instruments, etc. all meet the requirements of process regulations and can meet the requirements of process capability. If processing conditions change over time, adjustments and compensations can be taken in time to ensure quality requirements.
(4) Production equipment, inspection equipment, tooling, measuring instruments, etc. are in good condition and under control.
3, material factors (materials)
Analysis of materials:
1) Is it genuine?
2) Is the model number correct?
3) Is there a shelf life?
4) Has it been inspected in the factory?
5) Does it meet the specifications?
6) Does the material adapt to the environment? Does the material match the machine? Will the material and other materials not affect each other?
The main control measures are:
(1) There is a clear and feasible management system for material procurement, warehousing, transportation, quality inspection, etc., and strict implementation.
(2) Establish a system for incoming inspection, warehousing, storage, identification, and distribution, and implement it carefully, and strictly control the quality.
(3) The raw materials or semi-finished products transferred to this process must meet the requirements of the technical documents.
(4) The processed semi-finished products and finished products meet the quality requirements, and have batch or serial number identification.
(5) There are control methods for nonconforming products, with clear responsibilities, and can effectively isolate, identify, record and handle nonconforming products.
(6) Effective management of production material information and traceability of quality problems.
4. Factors of process method (method)
method analysis:
1: Is it done according to the law?
2: Do you understand?
3: Do you understand?
4: Is the law suitable?
5: Is there a law?
6: Is the method given to the corresponding person? Does the method go down in this environment?
The main control measures are:
(1) The process flow layout is scientific and reasonable, which can ensure that the product quality meets the requirements.
(2) It can distinguish key processes, special processes and general processes, effectively establish process quality control points, and clearly identify processes and control points.
(3) There are formal and effective production management methods, quality control methods and process operation documents.
(4) The main processes have operating procedures or work instructions, and the operating documents put forward specific technical requirements for personnel, tooling, equipment, operating methods, production environment, process parameters, etc. In addition to clarifying the process parameters, the process regulations for special processes should also specify the control methods of process parameters, sample preparation, working media, equipment, and environmental conditions.
(5) The important process parameters and characteristic values of the process documents have undergone process evaluation or process verification; the changes of the main process parameters of special processes must be fully tested and verified or qualified by experts before they can be changed.
(6) Prescribe inspection points, inspection methods, and acceptance criteria for each quality control point, and specify related treatment methods.
(7) Prescribe and implement procedures for the preparation, evaluation and approval of process documents to ensure the correctness, completeness and uniformity of the documents used at the production site, the process documents are in a controlled state, and the currently valid version of the process documents can be obtained on site.
(8) The various documents can be strictly implemented, and the recorded data can be filled in as required in time.
5. Environmental factors (ring)
ring analysis:
1. Has the environment changed on the timeline?
2. Have you considered light, temperature, humidity, altitude, and pollution?
3. Is the environment safe?
4. Is the environment artificial? Can the small environment and the big environment be compatible?
(1) Workplace environment. Refers to the placement of various products and raw materials, the arrangement of tools and equipment, and personal 5S.
(2) Control of dangerous goods. One is the stacking of chemicals, such as alcohol and thinner. The second is the control of six chemical substances in the production process (lead, mercury, cadmium, hexavalent complex, polybrominated biphenyls, polybrominated diphenyl ethers)
(3) Production environment. Refers to the control of temperature, humidity, and dust-free requirements for production conditions during the specific production process.
The main control measures are:
(1) There is a management system for environmental sanitation on the production site.
(2) Environmental factors such as temperature, humidity, light, etc. meet the requirements of production technical documents.
(3) There are relevant safety and environmental protection equipment and measures in the production environment, and the health and safety of employees meet the requirements of laws and regulations.
(4) The production environment is kept clean, tidy, and orderly, and there is no sundries irrelevant to production. Can learn from 5S related requirements.
(5) Materials, semi-finished products, utensils, etc. are all placed and stored neatly.
(6) Relevant environmental records can be effectively filled out or obtained.
6. Factors of measurement (measurement)
Analysis of the test:
1: Are the process inspection planning documents ready?
2: Are the process measuring instruments fully equipped? Does the performance meet the requirements? Is it measured regularly?
3: Is the inspection planning reasonable?
4: Are the inspectors qualified?
5: Is it reasonable to hand over the inspection point?
The main control measures include:
(1) Determine the measurement task and the required accuracy, and select the testing equipment that has the required accuracy and precision capabilities.
(2) Regularly confirm, calibrate and adjust all measurement and test equipment.
(3) Prescribe the necessary calibration procedures. The content includes equipment type, serial number, location, calibration cycle, calibration method, acceptance method, acceptance criteria, and measures to be taken when problems occur.
(4) Save the calibration record.
(5) When it is found that the measurement and test equipment is not in a calibrated state, the validity of the previous measurement and test results shall be immediately evaluated and recorded in the relevant documents.
Process standardization puts forward clear requirements for 5M1E, and we should incorporate process standardization into the overall plan for process quality improvement. Based on the formulation of relevant standardization requirements, through the investigation and analysis of process quality, the implementation deviations of the specific requirements of process standardization were found, and then improvement measures were taken. Through the continuous cycle of process quality improvement, promote the real realization and continuous improvement of process standardization, so as to achieve continuous improvement of process quality.
Attachment: 5M1E application
Site management
Process standardization: Process standardization is the key to process quality. Process standardization has a prominent position in process quality improvement. Process quality is affected by the six factors of 5M1E, namely human, machine, material, method, environment, and measurement, so work standardization is to Seek standardization of 5M1E;
Quality improvement: 5M1E is the six main factors affecting product quality and the main direction for analyzing quality problems;
Management improvement: 5M1E is the foundation of on-site management and the main direction to improve the management level;
Design plan verification: Fully conduct 5M1E analysis and verification in the design stage, which can make the design plan more in line with the requirements of the work.
Solve the problem:
5M1E is the direction for us to analyze and think about problems. To solve on-site problems, it must be combined with other management tools to find the root cause of the problem and formulate corresponding improvement measures. Common tools are as follows:
1. Fishbone diagram/fishbone diagram/Ishikawa diagram analysis method
2, fault tree analysis method
3, brainstorming
4, 5WHY analysis method
5, 5W2H analysis method
Factors affecting the quality of air compressors human, machine, material, method, environment, and measurement....
Recent related posts
-
08/29/2020
Factors affecting the quality of air compressors human, machine, material, method, environment, and measurement....
First of all, let's understand what is 5M1E?<br></br> A) Man: The operator’s knowledge of quality, technical proficiency, physical condition, etc.;<br></br>
-
08/29/2020
alert! These types of air compressors must not be bought, beware of being fooled!
alert! These types of air compressors must not be bought, beware of being fooled! These types of air compressors must not be bought, they are easy to be deceived!
-
08/29/2020
Compressor industry review after the mask ventilators are snapped up globally, relevant technical information has been made public
The ventilator is a vital medical device that can prevent and treat respiratory failure, reduce complications, and save and prolong the lives of patients. Facing the increasing number of patients with new coronary pneumonia, many countries are facing a shortage of ventilators.
-
08/29/2020
Is the temperature difference between the inlet and outlet of the cold dryer the bigger the better
Since the refrigeration dryer removes water by cooling the compressed air, many users think that the lower the outlet air temperature of the refrigeration dryer, the better,
-
08/29/2020
Compressed air energy storage emerges
In recent years, in addition to the social and economic development itself, the rapid development of negative products, shortage of energy resources and environmental pollution have attracted more and more attention.
-
08/29/2020
Compressed air is always oily Maybe you misunderstood the oil
In industrial applications, there is a volumetric separator. When the mixed gas passes through the separator, the increase in the flow area and the decrease in the flow rate and pressure make the air lose its carrying effect on the entrainment and achieve the purpose of separation.
-
08/29/2020
Six reasons and solutions for oily exhaust of screw air compressors
Failure factors of screw engine exhaust with oil Among the failures of screw compressors, the faults with oil in the exhaust are the most common. The main factors that cause the faults with oil in the exhaust are:
-
08/29/2020
Compressed air technology is moving towards an era of high efficiency
Compressed air is the most widely used energy source in industry and commerce, in addition to electricity. Its wide application stems from its easy operation, fast speed, high power density, safety and good compatibility, but its higher cost cannot be ignored...
-
08/29/2020
Discussion on ways to reduce the design cost of air compressor
Reduce the friction between the end face of the crankshaft and the end face of the crankcase On the direct-coupled air compressor, the front end of the crankshaft adopts gear transmission, and the gears are divided into straight and helical teeth.
-
08/29/2020
Comparison of okmarts.com rotary dryer and refrigerated dryer
Although both the air purification rotary dryer and the traditional refrigerated dryer (commonly known as "cold dryer") are used to remove water from compressed air, the details are very different.
Customers frequently viewed
IWAYA DENKI Water Pump 25CJT0752
Panasonic Servo Motor MHMF022L1V2M
Honeywell Solenoid Valve VE4025B1045
ROTEN Mechanical Seal 8E5K-22-X
Jeou Gang Overflow Valve MRV-04-P-1-A
BANDO Belt T2.5-420-11
Contrinex Sensor BD1-S3-P3
KEYENCE Input Output ModuleDL-RB1A